March 28, 2009
How The E. Stadium Bridge Gets Monitored
The idea was to check the bridge weekly for additional displacement of the fifth beam to determine if the traffic re-routing had allowed the beam to stabilize at the 7/8-inch deflection, plus give the rest of the bridge a visual once-over.
Read Full Story at The Ann Arbor Chronicle
|